Weifang Best Power Equipment   

 

Credibility  Profession  Innovate 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsConstruction Equipment Excavator

1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color

Good quality Concrete Boom Pump Truck for sales
Good quality Concrete Boom Pump Truck for sales
The products are superior in quality and cheap in quality. And the company has a great future!

—— Mr Orlande

I'm Online Chat Now

1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color

China 1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color supplier
1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color supplier 1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color supplier 1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color supplier

Large Image :  1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color

Product Details:

Place of Origin: China
Brand Name: MR
Model Number: MR8802

Payment & Shipping Terms:

Minimum Order Quantity: 1 set
Packaging Details: 13100kg
Delivery Time: 10 work days
Payment Terms: T/T, L/C
Supply Ability: 500 set per month
Contact Now
Detailed Product Description
Color: Customized Engine Power: 114KW
Engine Model: BF6M2012C Cylinder Number: 6
Maximum Excavation Height(mm): 3800mm Overall Dimension( LxWxH): 7500*2500*3500mm
Operating Weight: 13175kg

1.9m³ Excavator With 13175kg Operating Weight Construction Excavator

 
The Qualities of Our machines:
  • strong power and reliability
  • remarkable energy-saving effect
  • flexible and convenient manipulation
  • cheap machine but high quality
  • excellent working condition
  • reasonable price
  • Complete accessory and no oil leaking
More space, better visibility, air conditioning, a comfortable seat and plenty of storage space make it easy to work for hours without fatigue or discomfort.Enhanced viewThe front and side windows were enlarged to provide the operator with a better overview of the worksite, especially the areas to the left and right of the bucket. The company all staff willing to high-quality products and perfect service, and you join hands in creating brilliant. 
 

The detail parameter:

 

1.Parameter
Total mass (kg) 13100 Slewing speed (r/min) 12.2
Bucket capacity m3 - Traveling speed (low/high) (km/h) 3.6/37.5
Maximum digging force (kN) 97.7 Average ground pressure (mm) -
2.Dimension
Overall length (mm) 7479 Overall width (mm) 2496
Overall height (mm) 3543 Boom length (mm) 4400
Wheel track 1914 Stick length (mm) 2100
wheelbase(mm) 2800 Rear slewing radius (mm) 2290
Maximum digging radius (mm) 7770 Maximum digging depth (mm) 4700
Maximum discharge height(mm) 5943 - -
3.Engine
Engine model BF6M2012C Number of cylinders - bore x stroke (mm) 6-101×126
Engine type four-stroke,turbocharged,inter-cooled min fuel consumption rate -
Engine power (KW) 114 Maximum torque (N.m)/rotation speed (r/min) 610
Rated rotation speed (r/min) 2000 Emission standard GB 20891-2007
Displacement (ml) 6057 - -


 1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color
 
 

It can travel and work on swamp and soft areas.
Extendable chassis-------easy transporation, no need crane to dismantle
Korean made hydraulic pumps
Korean made valves
Korean made swing and travel hydraulic motors
Korean made hydraulic pilot valves
Luxurious cabin with air conditioner
 
1.9m³ 13175kg Earth Excavation Equipments , Heavy Equipment Excavator Customized Color

What should we pay attention to when using excavators?

1, excavators in the work, strictly prohibited maintenance, maintenance, fastening and so on. In case of abnormal sound, peculiar smell and temperature rise, the parking should be checked immediately.
 
2, excavator should not turn too fast, such as curve is too large, should turn.
 
3, when the excavator rotates, the use of rotary clutch, with the rotating mechanism, brake rotation smoothly, prohibit sharp rotation and emergency braking.
 
4, before the bucket does not leave the ground, shall not do rotation, walking and other operations.
 
5, crawler excavator moving, the arm should be placed in the direction of walking forward, the bucket from the ground height of not more than 1 meters.
 
6, when the excavator uphill, the drive wheel should be in the back, the arm should be on; when the excavator downhill, the drive wheel should be in front, the arm should be behind. Downhill should be slow, no change on the way.
 
7, the arm pulley at the top of the maintenance, maintenance, lubrication and replacement, the arm should be dropped to the ground.
 
8, when digging, each eating soil should not be too deep, the bucket is not too strong, so as not to damage the machinery or cause overturning accident. When the bucket falls, take care not to go too fast, so as to avoid the instability of the lower frame and the whole machine before and after shaking.
 
9, with the excavator operation, for cleaning, leveling, slope repair personnel, must work outside the radius of the excavator. If it is necessary to work within the radius of the excavator, the excavator must stop turning and turn off the pilot switch before it can do its work. At the same time, the crew should cooperate closely to ensure safety.
 
10, within the scope of excavator loading, shall not stop vehicles and pedestrians. When unloading the truck, wait for the truck to stop. The driver leaves the cab to turn the bucket and unload the car. When turning, the bucket shall be avoided as far as possible from the top of the cab. When unloading, the bucket should be lowered as far as possible, but it shall not be allowed to hit any part of the truck.

Contact Details
Weifang Best Power Equipment Co., Ltd.

Contact Person: jacky

Send your inquiry directly to us (0 / 3000)